Audits
Every review of the vault upgrade and Yellowback is listed here with its scope and outcome. Internal reviews are labeled as internal.
| Date | Review | Scope | Outcome |
|---|---|---|---|
| 2026-10-10 | Falcon-512 consensus audit Internal | Falcon and SLH-DSA verification on both C++ lines | No critical or high findings; protocol-level risk noted |
| 2026-10-01 | Ecosystem security audit Internal | Every repository: nodes, wallets, lightwalletd, clients | All critical-to-low findings fixed on both lines |
| — | Third-party audit Planned | The vault primitive, the YED module, post-quantum verification | gate before mainnet |
| — | Kogany port review Planned | Every consensus hook in Kogany, with its four-part check (the review package) | before Kogany is signed off as a qualified node line |
